HTRW Remediation – Sault Ste. Marie (Spring 2025)
Walsh Service Solutions performed specialized Hazardous, Toxic, and Radioactive Waste (HTRW) remediation at a remote, century-old federal facility. This project involved the precise abatement and disposal of legacy asbestos-containing materials to ensure the safety and compliance of the structure.
Project Overview
-
Project Value: $34K
-
Timeline: Spring 2025
-
Location: Sault Ste. Marie, Michigan
-
Key Metrics: 820 sq. ft. of heavy mastic removal | 27 LF of metal panel abatement
Project Scope & Operations
-
Asbestos Abatement: Executed the systematic removal of asbestos-containing floor tiles and heavy mastic across 820 square feet of the facility.
-
Specialized Demolition: Performed abatement and removal of 27 linear feet of metal panel walling integrated with hazardous materials.
-
Environmental Monitoring: Conducted rigorous air monitoring throughout the abatement process to ensure site safety and regulatory compliance in the remote environment.
-
Hazardous Waste Disposal: Managed the secure containment, transport, and certified disposal of all asbestos-generated waste according to federal HTRW standards.
The Result
Despite the challenges of working in a remote, aging facility, WSS completed the remediation within the Spring 2025 timeline. Our team successfully eliminated the identified hazards, allowing for continued facility maintenance or renovation without the risk of asbestos exposure.