Wind River Healthcare Expansion

Federal Healthcare Construction & TERO Compliance

Walsh Service Solutions is managing a critical infrastructure expansion at the Wind River Reservation in Wyoming. This federal project involves the construction of a new 2,700 sq. ft. addition to an existing 24,000 sq. ft. healthcare facility, requiring a high degree of logistical coordination to ensure medical services remain uninterrupted.


Project Overview

  • Current Value: $3.92M

  • Timeline: 2024 – Present (70% Complete)

  • Location: Wind River Reservation, Wyoming

  • Scope: 2,700 sq. ft. expansion to a 24,000 sq. ft. facility


Project Scope & Key Challenges

  • Healthcare Continuity: Executing construction while maintaining 100% operational continuity of the active medical facility, ensuring patient care is never compromised.

  • Strict Regulatory Compliance: Adhering to stringent federal medical construction standards, ICRA (Infection Control Risk Assessment) protocols, and safety standards.

  • Tribal Partnership (TERO): Successfully collaborating with the Tribal Employment Rights Office (TERO) to prioritize local workforce participation and comply with tribal regulations.

  • Remote Logistics: Managing complex supply chain and labor logistics in a remote Wyoming location through a multi-year schedule.

The Result

By combining technical expertise with a deep respect for tribal requirements, WSS is delivering a modern healthcare expansion that meets the community’s growing needs—remaining on schedule and in full compliance with all federal and tribal mandates.